Commercial Flood Prevention Specialists

As one of the UK’s leading flood prevention specialists for Infrastructure, Commercial & Industry (ICI), our technical staff have extensive experience in developing and delivering successful effective solutions to protect Business, infrastructure and communities from flood chaos.

Working in partnership with many of the UK’s leading building and civil contractors, we are recognised as the ‘go to’ flood experts who ensure innovation, professionalism and quality workmanship in brought to every project.

Our staff work in partnership with a team of team of specialist designers, engineers and project managers, to deliver high profile flood mitigation contracts for a wide range of private sector clients including leading players in the utilities and transport sectors.

Commercial Flood Prevention Specialists

M3 Floodtec staff have extensive experience in high profile flood mitigation projects in both the UK and Internationally. 

Delivering a wide range of successful contracts for leading energy, utility and transport infrastructure providers as well as local community and regional authority councils and the Environment Agency.

Our technical specialists expertise, working alongside our construction partners, extend to the development of flood mitigation measures to commercial establishments, retail parks, leisure facilities as well as local public buildings and infrastructure.

All of our staff have extensive experience in seamless project management from design concept through to final handover and ongoing maintenance programmes. Working with established flood professionals and specialist contractors ensures successful delivery for all projects regardless of size or location.

M3 Floodtec understand the importance of customer service to facilitate the effective delivery of any contract and ensure that this is prioritised at every stage of the project.

ICI & Commercial Flood Protection Solutions

Flood & Storm Tide Gates
One Man Operational (OMO)

Flood & Storm Tide Gates

The One Man Operational (OMO) Flood Gate is a horizontally opening flood gate. The gate is controlled manually, with an option for hydraulic or electronic control.

Flood & Storm Tide Gates
One Man Operational (OMO)
  • Suitable for coastal, estuarine & riverine flood protection
  • Standard sizes & bespoke designs available
  • Designed accordingly to steel structures EN1993
  • Available in a large range of colours
  • Low maintenance
  • Life span in excess of 25 years

View details

Flood & Storm Tide Gates
One Man Operational (OMO)

View details

Flood Defence Glass Wall Barriers
100% Passive Protection from River & Tidal Flooding

Flood Defence Glass Wall Barriers

M3 Floodtec Glass Wall Barriers are designed to offer unobtrusive, maximum protection without compromising the views.

Flood Defence Glass Wall Barriers
100% Passive Protection from River & Tidal Flooding
  • Blast & Ballistic Grade Glass
  • Anodised Aluminium or G316 Stainless Steel Frames
  • Single Frame or Modular Systems
  • Low Cost 100% Protection
  • Maximum Glass Area for Visual Appearance
  • Permanent Flood Protection

View details

Flood Defence Glass Wall Barriers
100% Passive Protection from River & Tidal Flooding

View details

Flood Defender Wall
Lightweight, robust and easy to deploy

Flood Defender Wall

The Flood Defender Wall is a demountable flood barrier system suitable to span wide apertures and is quick and easy to install.

Flood Defender Wall
Lightweight, robust and easy to deploy
  • Suitable for coastal, freshwater and brackish water conditions.
  • Specialist fixtures to ensure parts have a long life span.
  • Suitable for disabled access.
  • Integrated ID tags on each barrier for easy identification during deployment.

View details

Flood Defender Wall
Lightweight, robust and easy to deploy

View details

Self Activating Barrier (SAB)
The SAB is BIM Level 2 Compliant

Self Activating Barrier (SAB)

The Self Activating Barrier’s success can be attributed to its’ simple yet ingenious approach to flood defence.

Self Activating Barrier (SAB)
The SAB is BIM Level 2 Compliant
  • Passive, long term, cost effective solution
  • Can be installed to any length, with post breaks every 12 metres
  • Invisible when closed, allowing for normal traffic flow and uninterrupted views
  • Low maintenance and minimal ongoing operational costs
  • Not subject to vandalism

View details

Self Activating Barrier (SAB)
The SAB is BIM Level 2 Compliant

View details

Steel Flood, Fire & Security Door
Manufactured under ISO 9001 standards

Steel Flood, Fire & Security Door

Manufactured in the UK, the Steel Flood, Fire & Security Door is designed to offer secure protection against flood, fire and unauthorised entry.

Steel Flood, Fire & Security Door
Manufactured under ISO 9001 standards
  • Provides 24/7 protection
  • Holds two Kitemark certifications to PAS 1188-1:2014
  • Can be designed and manufactured for use on both single and double doors (outward opening) to a variety of widths and heights
  • Acts as a standard steel door in all other aspects including security, fire and escape
  • Can incorporate glazed or louvre panels as well as fixed or removable overhead steel panels or overhead transom doors
  • Manufactured from 1.5mm galvanised steel, zintec treated to prevent corrosion

View details

Steel Flood, Fire & Security Door
Manufactured under ISO 9001 standards

View details

Stop Log Barrier System
No width or height limitations

Stop Log Barrier System

M3 Floodtec Stop Log Barriers are lightweight, robust and versatile, designed to span wide distances and are easily deployed in a flood situation.

Stop Log Barrier System
No width or height limitations
  • Quick & Convenient
  • Robust & Strong
  • Corrosion Resistant
  • Maintenance Free
  • Easy to Store
  • Suitable for use in Residential, Commercial, Industrial & Infrastructure

View details

Stop Log Barrier System
No width or height limitations

View details

Commercial Flood Prevention Specialists

Project Management

At M3FLOODTEC we understand that flexibility is fundamental and a “one size fits all” does not provide best value. Each project is bespoke and our technical staff together with project management will work as a seamless delivery team with our Clients - be it the EA or a major UK or International contractor.

Client Liaison

Scheduled Client meetings are essential to effective project management from feasibility through design and to construction completion. In the case of community projects experience confirms that early stakeholder involvement is fundamental to successful delivery.

M3FLOODTEC will engage with our Clients to develop a community liaison plan as a key deliverable against the project milestones.

Client Progress Reporting

Effective communication is a key driver to any project and our staff have extensive experience from past construction projects both small as well as large all around the Globe. Commitment to providing accurate information, on time is a priority driver for our project management staff.

Commercial Flood Prevention Specialists

Survey, Installation & Testing

For commercial and infrastructure projects advanced surveys may be required, M3 Floodtec in conjunction with specialist designers are able to arrange this to ensure all of the potential risks are considered to protect against the effects of a flood.

Surveys

Our surveys will identify the areas of risk and the mitigation measures available, some of which may use off the shelf products and others may require a bespoke design. In all cases our technicians will seek to develop passive solutions where minimal intervention would be required to manage the risks of flood inundation.

Installation

M3 Floodtec management are able to oversee installations and to ensure that products are constructed and installed to the correct specification and have developed comprehensive onsite testing procedures to demonstrate the correct operation of all product under flood conditions.

Commercial Flood Prevention Specialists

Site Management, Training & Maintenance

Site Management

We appreciate the importance of efficient site management in both the successful delivery of a project and the management of client expectation. 

M3 Floodtec will dedicate a single point of contact on all projects to maintain the strong lines of communication at all stages of project delivery and to maintain continuity between the different elements in the overall development from initial concept to final handover.

Training & Maintenance

The distinct advantage of passive flood mitigation is that active maintenance is minimal, often only requiring a yearly inspection.

Our specialist technical staff will ensure that clear and concise explanation on all products is delivered as part of the overall project plan as well as providing detailed technical documentation and specification literature on all products. To ensure effective long term operation of each product appropriate maintenance undertaken in accordance with the recommendations is crucial.

Typically a maintenance regime will be developed at design stage and incorporated into the overall project plan and safety case. Our technical staff will provide the necessary data to support this.

Commercial Flood Prevention Specialists

Quality Standards

We place great importance in ongoing client care, although a comprehensive training and education program will have been implemented our commitment is to maintain communication with all Clients as the whole lifecycle of a project develops, as and when required.

Health & Safety

M3 Floodtec will provide the necessary technical data for incorporation into the Construction Phase H&S plans, Risk Assessment, Method Statements, to provide CDM compliance at all stages of the project.

Quality Control

Only products holding Kitemark PAS 1188-1:2014 are used where possible or where products have got a Kitemark scope that can be used.

Quality Management Systems

M3 Floodtec will work with existing Quality Management Systems to ensure that correct procedure is maintained at all times.

Quick Enquiry

If you would like further information about our Flood Prevention Solutions, please send us your details and we will be in touch to discuss your requirements.

What Flood Prevention Solutions are You Interested in?

Submitting your details lets us know that you are happy to receive communication from us and that you have also read our privacy statement. You can opt out of these communications at any time.

Please tick the above box to enable the form.

BSI Flood Protection Kitemark KM713574
ISO 9001 Quality Management
Constructionline
Hereford & Worcestershire Chamber of Commerce
bimstore
Parlimentary Review
Site by Kingsford

Flood Checker