FLOOD PREVENTION SPECIALIST

M3FLOODTEC staff have extensive experience in high profile flood mitigation projects both UK and International, delivering a wide range of successful contracts for leading energy providers, utility and transport infrastructure providers as well as local community and regional authority Councils and the Environment Agency.

Our technical specialists expertise, working alongside our construction partners, extend to the development of flood mitigation measures to commercial establishments, retail parks, leisure facilities as well as local public buildings and infrastructure.

All of our staff have extensive experience in seamless project management from design concept through to final handover and ongoing maintenance programmes. Working with established flood professionals and specialist contractors ensures successful delivery for all projects regardless of size or location.

M3FLOODTEC understand the importance of customer service to facilitate the effective delivery of any contract and ensure that this is prioritised at every stage of the project.

SURVEY

For commercial and infrastructure projects advanced surveys may be required, M3FLOODTEC in conjunction with specialist designers are able to arrange this to ensure all of the potential risks are considered to protect against the effects of a flood. These surveys will identify the areas of risk and the mitigation measures available, some of which may use off the shelf products and others may require a bespoke design.

In all cases our technicians will seek to develop passive solutions where minimal intervention would be required to manage the risks of flood inundation.

INSTALLATION & TESTING

M3FLOODTEC management are able to oversee installations and to ensure that products are constructed and installed to the correct specification and have developed comprehensive onsite testing procedures to demonstrate the correct operation of all product under flood conditions.

SITE MANAGEMENT

We appreciate the importance of efficient site management in both the successful delivery of a project and the management of Client expectation. M3FLOODTEC will dedicate a single point of contact on all projects to maintain the strong lines of communication at all stages of project delivery and to maintain continuity between the different elements in the overall development from initial concept to final handover.

TRAINING & MAINTENANCE

The distinct advantage of passive flood mitigation is that active maintenance is minimal, often only requiring a yearly inspection.

Our specialist technical staff will ensure that clear and concise explanation on all products is delivered as part of the overall project plan as well as providing detailed technical documentation and specification literature on all products. To ensure effective long term operation of each product appropriate maintenance undertaken in accordance with the recommendations is crucial.

Typically a maintenance regime will be developed at design stage and incorporated into the overall project plan and safety case. Our technical staff will provide the necessary data to support this.

QUALITY STANDARDS

HEALTH & SAFETY

M3FLOODTEC will provide the necessary technical data for incorporation into the Construction Phase H&S plans, Risk Assessment, Method Statements, to provide CDM compliance at all stages of the project.

QUALITY CONTROL

Only Kitemark products to PAS 1188-1:2014 are used or where products have got a Kitemark scope that can be utilised.

QUALITY MANAGEMENT SYSTEMS

M3FLOODTEC will work with existing Quality Management Systems to ensure that correct procedure is maintained at all times.