Merrythought Village, Ironbridge

Client: Merrythought Village

The Problem

Dating back to the turn of the 19th century, Merrythought Village comprises renovated bespoke retail workshops and is home to the last teddy bear manufacturers in the UK.

Situated at the northern end of the Wharfage in Ironbridge Gorge, the site is prone to flooding from the River Severn, which borders the property and frequently features in media coverage during flood events. Protecting the village required careful consideration of the heritage status of the buildings and the variety of uses across the site.

The Solution

A combination of passive and deployable flood technologies was deployed to safeguard the village while respecting the heritage and operational requirements of each building. This integrated approach provided comprehensive resilience against flood inundation while maintaining the functionality and character of the site.

The solutions installed included:

Get in Touch

Sign up to mailing list

*Indicates required.

By submitting this form, I confirm that I have read and agreed to M3 Floodtec Terms & Conditions and Privacy Policy

© 2026 M3 Floodtec