Maldon Bypass Gates, Essex

Client: Environment Agency

The Problem

Maldon Bypass Gate is an important flood defence structure on the Chelmer and Blackwater Navigation.

The gates help control water movement and manage flood risk in the surrounding area.

The existing timber gates had reached the end of their service life, and the steelwork was beginning to buckle.

The Environment Agency needed a replacement pair, while principal contractor BAM UK & Ireland wanted one contractor to manage the project from start to finish.

The Solution

M3 Floodtec surveyed and designed two bespoke Ekki hardwood mitre gates, each measuring approximately 3.29m x 3.45m.

The gates feature galvanised steelwork on both sides and diagonal support ties. New pivot fittings and two sets of stop logs were also supplied, while the existing operating equipment was refurbished off site.

Temporary dams were put in place to allow the chamber to be pumped dry. The old gates were then craned out and the new gates lifted into position, tested and signed off.